Aethos

Pricing built on proper preparation

The price is in the preparation.

Painting is often the shortest stage. The condition and material of the substrate decide what must happen first if the finish is to look right and perform as intended.

I quote for the work your property actually needs, rather than give a flat room rate. The preparation, materials and agreed work are set out in writing.

What the quotation means

Labour and materials, clearly specified.

Surfaces and areas included

Preparation and repairs within scope

Primer, coating system, finish and coats

Protection, access and working sequence

Items excluded or requiring separate assessment

Quotation, guarantee terms and handover record

I accept all major credit and debit cards, as well as bank transfer.

Four common scopes

What we inspect, and what changes the work.

01

Individual rooms

Room size matters, but the existing surface normally decides the preparation programme.

Normally defined in writing

  • Labour and specified decorating materials
  • Agreed protection and preparation
  • The coating system and number of coats in the quotation

Common scope changes

  • Cracks, staining or loose previous coatings
  • Detailed cornices, panelling, doors and other joinery
  • Furniture, access and occupied home sequencing

02

Kitchen cabinetry

Door count is only the starting point. Material, existing finish and adhesion determine whether repainting is suitable and how it should be prepared.

Normally defined in writing

  • Assessment of suitable doors and fixed cabinetry
  • Cleaning, abrasion and primers described in the scope
  • Labour, specified coatings and orderly reinstatement

Common scope changes

  • Failed or incompatible previous coatings
  • Repairs, damaged edges and complex profiles
  • Hardware changes or work beyond the painted cabinetry

03

Exterior work

Exposure, safe access and the condition beneath the visible paint shape exterior pricing.

Normally defined in writing

  • Preparation based on condition preparation in agreed areas
  • Compatible primers and finish coats in the specification
  • Labour and standard decorating materials

Common scope changes

  • Scaffolding, towers or specialist access
  • Rot, open joints, failed render or other building repairs
  • Widespread coating failure and restricted weather windows

04

Whole homes

A complete home is built from a room by room survey, then coordinated into one practical sequence.

Normally defined in writing

  • A written schedule by room and surface
  • Agreed protection, preparation, labour and specified materials
  • Sequencing, inspection and recorded paint details

Common scope changes

  • The condition and detail of each room
  • Whether the property is occupied, empty or furnished
  • Phasing, access dates and work added after agreement

Scope illustrations, not quotations

Why similar jobs can cost different amounts.

These anonymised examples contain no fixed prices. They show why the visible size of a project is only one part of a written quotation.

01

Two similarly sized rooms

Both rooms may have the same floor area, yet the work beneath the finish can be very different.

Lighter scope

A sound, previously painted room with limited filling, straightforward access and only walls and ceiling in scope.

Deeper scope

Cracked plaster, staining, loose previous coatings, detailed cornice and several doors or other joinery requiring separate preparation.

Why they differ

Repair extent, stain control, edge detail, joinery and the number of distinct coating systems change the preparation programme.

Recorded separately

Active moisture, structural movement or specialist plaster repair would be identified for diagnosis rather than hidden within a decorating allowance.

02

Two kitchens with similar door counts

Door count helps describe scale, but the material and existing coating decide whether the cabinetry is suitable for repainting.

Lighter scope

Stable factory finished doors with accessible profiles, sound edges and hardware that can be removed and reinstated without alteration.

Deeper scope

Contaminated surfaces, damaged edges, complex mouldings or a failed previous repaint requiring extensive cleaning, abrasion and compatible primers.

Why they differ

Adhesion risk, repair needs, profile complexity and dismantling determine how much controlled preparation is required.

Recorded separately

Replacement doors, joinery alteration and hardware changes are recorded outside the painted cabinetry scope.

03

Two comparable exteriors

Neighbouring elevations can look alike from the road while carrying different exposure and coating failures.

Lighter scope

Accessible, stable masonry with localised preparation and a compatible existing system in a workable weather window.

Deeper scope

Salt exposure, widespread flaking, open joints, decayed timber or restricted access requiring towers or scaffolding.

Why they differ

Safe access, weather, coating removal and the condition beneath visible paint shape both sequence and labour.

Recorded separately

Scaffolding, rot repairs, failed render and specialist building work are identified separately wherever possible.

04

Two whole homes with the same room count

A room total cannot show how occupied, detailed or affected by repairs each part of a home will be.

Lighter scope

An empty property with sound surfaces, clear access and a consistent specification across rooms.

Deeper scope

A furnished, occupied home with phased access, period details, mixed substrates and room by room repairs.

Why they differ

Furniture, daily reinstatement, phasing, substrate variation and detailed woodwork add coordination as well as preparation.

Recorded separately

Hidden defects, added rooms and changes requested after agreement are discussed and recorded before the scope changes.

Before a figure is fixed

Unknown defects should not become vague allowances.

Major building repairs, specialist access or scaffolding, hidden defects and work outside the decorating scope are identified separately wherever possible. If a concealed area needs to be opened for inspection or a specialist needs to assess a defect, I explain that before including it in the price.

Changes after agreement are discussed and recorded rather than assumed. That protects the finish, the programme and the budget.

A useful first brief

Show us the surfaces, not only the room count.